Three responsibility scopes that double an integration quote
Two teams quote the same form-to-CRM integration. One comes back at 2.9M KRW, the other at 6M. Nobody is lying: the difference is almost always the responsibility scope, not the number of screens. Three lines in the scope document move the price more than any feature list.
1. Data ownership
The cheap quote assumes the client owns master data: the customer record already exists, the dedupe key is already decided, and field mapping is provided as a sheet. The expensive quote assumes the vendor builds and maintains that mapping, including the edge cases: two records with the same phone number, a company name that changes, a field that arrives in three formats from three forms.
Concretely, one line decides it either way:
- "Dedupe key: request_id, supplied by client form" -> cheap
- "Dedupe key: to be designed, including historical backfill" -> expensive
2. Failure ownership
The second gap is what happens after a failure. Two scopes exist.
Scope A: the integration returns an error and logs it. Someone on the client side watches the log and retries. This is what most quotes include, and it is honest as long as the client has a person for it.
Scope B: the integration has a failure queue, a retry schedule, alerting, and a runbook the client's team can follow. This is where "the lead silently disappeared for three hours" stops being possible, and it is a different build.
One sentence in the scope decides which one you bought:
- "Failures are logged to the application log"
- "Failed writes are queued, retried on a schedule, and alerted after two consecutive failures"
3. Change ownership
The third gap appears in month two. An API adds a required field. A status value is renamed. Who pays?
A fixed-scope quote usually ends at delivery plus a short defect window. A maintenance scope continues, and its price sits in the monthly line, not the project line. Comparing the two project totals without reading this line is how teams end up surprised.
| Scope line | Fixed delivery | With maintenance |
|---|---|---|
| Mapping design | client provides | vendor designs |
| Failure handling | log only | queue + retry + alert |
| API change handling | new quote | covered for N months |
| Typical price | 2.9M KRW | higher project + monthly |
None of this is an argument for the higher number. A team with an ops person and stable systems should buy the cheaper scope and keep the difference. What should not happen is buying the cheap scope and expecting the expensive behaviour in week three.
The practical move is to put all three lines in the quote itself, in the client's words, and have both sides initial them. Then the second quote is not cheaper or more expensive, it is simply a different product.
Scope and price table: https://web.intelliliving.kr?utm_source=hashnode&utm_medium=organic&utm_campaign=b2b_obsidian&utm_content=hn_03
One line, if you have it: in your current setup, who retries a failed write - a person, a queue, or nobody?